Start with the use of the space.
A tenant change, revised occupancy, new equipment, or different room layout can alter mechanical requirements. Share existing plans, lease constraints, and operating needs before the scope is developed.
- Building use, occupancy, and available system records
- Access, placement, and supporting construction
- Electrical, controls, and shutdown coordination
Put the operational details in writing.
Delivery access, rooftop or equipment-room constraints, tenant communication, work windows, temporary arrangements, and closeout requirements all affect the project. Scheduling and specialized-system availability are confirmed after review.

