Start with the layout, not the last-minute connection.
Moving a sink, shower, toilet, or laundry area can affect more than the visible fixture. Review drain locations, vent routes, water supply, access, and the structure before the cabinet or tile layout is final.
- Fixture locations and manufacturer requirements
- Rough-in timing before wall and floor closure
- Coordination with electrical, cabinetry, and waterproofing
Know where the plumbing scope ends.
Ask whether demolition, access openings, testing, fixtures, trim installation, and restoration are included. Owner-supplied products, long lead times, and existing concealed conditions should be recorded as assumptions or open decisions.

